High Court Division :
(Special Original Jurisdiction)
Naima Haider J
ATM Saifur Rahman J
Judgment
October 31st, 2017
TM Textiles and Garments Ltd.... Petitioner
vs
Bangladesh, represented by the Secretary Ministry of Power, Energy and  Mineral Resources, Bangladesh Dhaka and others. ..........Respondents
Constitution of Bangladesh, 1972
Article 102(2)
Arbitration claim-The dispute is not a "contractual dispute"; the dispute, it seems, relates to the propriety of the decision to provide gas connection to others through the petitioner's dedicated line. That being the position, this Division can interfere and there is no need for the petitioner to refer this matter to arbitration.
We feel that justice would be best served if the Rule is disposed of with the direction upon all concerned to ensure that the petitioner is ensured the "approved gas supply and approved pressure" at all material times. No gas connection is to be provided to the other nine factories unless the "approved gas supply and the approved gas pressure" is ensured. The respondents are further directed to ensure strict compliance with the conditions set out in the aforesaid paragraph in connection with providing gas connection to the nine factories. .........(10 & 15)
Nuruddin vs Titas Gas, 3 BLC (AD) 231 ref.
Ajmalul Hossain QC, Senior Advocate with Md Saifullah Mamun and Forrukh Rahman, Advocates-For the Petitioner.
Probir Neogi, Senior Advocate with AM Amin Uddin, with Munshi Muniruzzaman, with. Suvra Chakraborty, with Yousuf Khan Rajib, with Shakib Rejwan Kabir, with Anita Ghazi Rahman, with Manjur Al-Matin, with Taposh Bandhu Das, and Sumon Ali, Advocates-For the Respondent No. 6-14.
Dr Md Bashir Ullah, Advocat-For the Respondent No.2.
Judgment
Naima Haider J : In this application under Article 102 of the Constitution, Rule was issued calling upon the respondent to show cause as to why the impugned Letter No.1 bearing Reference No. †RvweA/fvjyKv/757.6/899 dated 30-3-2015 (Annexure-'K' to the Writ Petition) and the impugned Letter No. 2 bearing Reference No. †RvweA/fvjyKv/757.6/1025 dated 1- 7 -2015 (Annexure-'O' to the Writ Petition) should not be declared to be without lawful authority and are of no legal effect and/or such other or further order or orders passed as to this Court may seem fit and proper.
2. The relevant facts, in brief, are as follows: The petitioner is engaged in the business of manufacturing and exporting knit products. The petitioner uses gas as a raw material in the manufacturing process. The petitioner applied for gas connection for both Captive Power and Industrial Project. The petitioner's requirement, amongst others,. was pressure of 50 PSIG. Although the respondents provided the said gas connection, the respondents could not consistently provide the approved quantity of gas. The respondents could also not ensure continuous gas pressure of 50PSIG. Thereafter, the petitioner, by its letter dated 19-6-20 12 applied for dedicated 150 psi 12-inch gas line connection from the respondent No. 2's "Dhanua Town Bordering Station" to the petitioner's factory. The dedicated line was to ensure that approved gas supply and the approved pressure are maintained.
The petitioner undertook to pay the cost of such dedicated line. The respondent No.2 by its letter dated 4-7-2012 approved the increased load and also approved the construction of the dedicated pipeline. The petitioner thereafter requested for confirmation and assurance from the respondent No.2 regarding, among others, of undisturbed gas connection. The petitioner also requested the respondents not to provide any gas connection to anyone from the said dedicated gas line. The respondent No.2 by its letter dated 25-10-2012 provided such assurance by stating ÒAvcbvi abyqv wUwmGm G wbwg©Ze¨ AviGgGm nB‡Z fvjyKv¯' †gmvm© wUGg †U·UvBj GÛ Mv‡g©›Um wjwg‡UW Gi Avw½bv ch©šÍ 12© © x 140 wcGmAviBwR M¨vm weZiY jvBb nB‡Z Ab¨ †Kvb MÖvnK‡K M¨vm ms‡hvM bv cÖ`v‡bi Aby‡iva Kwiqv‡Qb| GB wel‡q Avcbv‡`i Rvbv‡bv hvB‡Z‡Q †h, Avcbv‡`i eZ©gvb I fwel¨r Pvwn`v we‡ePbvq AvbygvwbK 8 GgGgwmGdwW M¨vm mieivn wbwðZ bv Kwiqv D³ M¨vm weZiY jvBb nB‡Z Ab¨ MÖvnK‡K M¨vm mieivn Kiv nB‡e bv|
3. The petitioner started the construction work of the dedicated pipe line from "Dhanua Town Bordering Station" to the petitioner's factory. M/s ARKO Engineering Limited was appointed for the said purpose for approximately Taka 20,43,44,289. When the construction work was completed, the respondent authority conducted successful examination of the said pipe line. Thereafter, gas was supplied to the petitioner's factory through the dedicated line. However, in contradiction with the previous assurances, the respondent authority requested the petitioner to sign two Gas Sale Agreements.
The said agreements were signed on the standard template and there was no room for negotiation. The petitioner came to know that the respondent authority is planning to give gas connection to nine (9) other industries through the petitioner's dedicated line given that their location was closer to the dedicated line.
The petitioner requested the respondents at several times, not to provide such gas connections. The respondents paid no heed thereto. The respondents, to the contrary approved the gas connections of the said factories from the dedicated line of the petitioner. Experts from Hong Kong concluded that the gas pressure would be very low if gas supply is given through the dedicated line. Despite this, the respondents proceeded with providing gas connections to other factories through the dedicated line.
4. Finding no other alternative efficacious remedy, the petitioner has moved this Court and obtained the instant Rule Nisi.
5. The respondent Nos. 2 and 6-14 enter appearance by filing Affidavit-in-Opposition. The respondents point out that the petitioner would not be affected as a result of the new gas connections through the dedicated line. The respondents have tried to illustrate this through mathematical statistics. The respondents also contend that since the pressure of the present gas flow is 120 PSIG which is less than the approved pressure, it would make no difference if gas is supplied to the others.
6. Mr Ajmalul Hossain QC, Senior Advocate for the petitioner at the outset submits that the dispute in question is not a dispute that should be referred to arbitration and hence the writ petition is maintainable. He further submits that the position taken by the petitioner is not controverted. The only issue for determination is whether the respondents are at liberty to permit others to use the dedicated line of the petitioner when such use may affect the gas supply and gas pressure to the petitioner's factory.
7. Mr Probir Neogi, Senior Advocate, with Mr AM Amin Uddin, Senior Advocate appearing on behalf of the respondent Nos. 6-14 points out that the pipeline in question has a capacity of 15,70,000 CFT/Hr, whereas, the approved load of the petitioner is 1,43,470 CFt/Hr, ie. a fraction of the total load. Hence, there is a surplus capacity of 14,26,530 CFt/Hr in the said pipeline. 90.86% of the capacity of the pipeline remains to be utilized. Even if the approved load of the petitioner is increased to 3,33,334 CFt/Hr, which is enough to meet the future demands of the petitioner, there will still be a surplus supply, of 12,36,666 Cft/Hr. The total demand of the nine industries for which connections were approved stands at 11,07,741 CFt/Hr. Therefore, even after giving connection to the nine factories, there would be surplus capacity. As a result, the petitioner would not be prejudiced and the petitioner's fundamental rights would not be infringed. Mr Neogi's submission was adopted by the learned Counsels appearing for the other respondents.
8. Dr. Md Bashir Ullah, the learned Advocate appearing on behalf of the respondent No.2 submits that there are certain factual aspects involved in the writ petition and therefore, it should be addressed by the Energy Regulatory Commission of Bangladesh.
Dr. Bashir Ullah further submits that the petitioner entered into contractual arrangement and therefore, disputes should be resolved by the arbitrators in light of the arbitration clause in the agreements. On these counts, the learned Advocate submits that the Rule should be discharged and placed reliance upon the decision of our Hon'ble Appellate Division in the case of Nuruddin vs Titas Gas, reported in 3 BLC (AD) 231.
9. We have considered the submissions of the learned Counsels appearing for the petitioner and the respondents. We have also perused the writ petition, the Affidavit in Opposition and the documents annexed thereto.
10. In our view, dispute which compelled the petitioner to move this Division is, in strict sense, not a dispute that should be resolved by arbitration, as suggested by Dr. Md Bashir Ullah. The dispute is not a "contractual dispute"; the ( dispute, it seems, relates to the propriety of the decision to provide gas connection to others through the petitioner's dedicated line. That being the position, we think that this Division can  interfere and there is no need for the petitioner to refer this matter to arbitration.
11. The reports prepared by BUET and OSAKA Engineering Ltd are helpful in understanding the factual position. For ease of reference, we set out below the relevant parts of the reports:
 (To be continued)
BUET:
Total capacity of the gas line, as claimed by TITAS gas, as 1,570,000 cft/hr is correct if Titas Dhanua station gas pressure is 140 psi and atmosphere pressure supply to TMBD site. However, if 45 psi. pressure is to be maintained at TMBD site, gas line capacity will be reduced to 1,440,000 cft/hr.
It is clear that gas consumption figures as mentioned in the drawing are feasible. If the supply is less than 140 psi, gas supply figures will be less than the desired values.
Technically it is possible to install automatic gas control valve at TMBD to throttle the gas supply to other factories in case TMBD RMS intel pressure goes down a certain value of 45 psi.
Gas pipeline can supply a certain amount of gas depending on the supply pressure to guarantee a supply of333333 cft/hr, supply to other has to be reduced or supply pressure at TBS has to boosted.
OSAKA:
Gas can be supplied from existing TMBD dedicated 12" x 140 PSIG pipeline to TMBD and the other nine factories as per their gas requirement (TMBD: 333.334 scf/hr, the other nine factories: 1,107,741 scf/hr) only if the pressure at TITAS Dhanua TBS, which is the TMBD pipeline start point can be maintained to 140 psi or above.
If the intel pressure ofTMBD pipeline at TlTAS Dhanua TBS decreases below 140 psi, there will be a possibility not to able to cover total gas requirement from TMBD and the other nine factories as above."
12. The importance of dedicated line is clear from the aforesaid. The petitioner spent a significant amount for the construction of the dedicated line, in 'compelling circumstances. We would have thought that the petitioner never intended this pipe for "common use". That being said, we cannot rule out the possibility that the petitioner might have also been open to the idea that the line may be used for others only on the strict condition that the use would not, in any way, affect the petitioner's gas supply and the gas pressure.
13. The Counsel for the petitioner provided a solution; the petitioner would be agreeable to the gas connection from its dedicated line if it is ensured that the approved quantity and the approved pressure is maintained through installation of Automatic Pressure Regulated Gas Flow Control Valve. The learned Counsel further points out that the petitioner agrees to the recommendation on installation of Automatic Pressure Regulated Gas Flow Control Valve, subject, to the conditions of installation, set out below:
"No gas connection shall be given to any other factory/consumer from the upstream of TMBD 12-inch 140 PSIG dedicated gas line before the point of its connection to the intel of factory RMS of TM Textile & Garments Limited from this gas line.
Gas connection to other factories/ consumer may be made from downstream of TMBD 12-inch 140 PSIG dedicated gas line after the point of its connection to the intel of factory RMS of TM Textile & Garments Limited from this line with condition that such connection can only be made through an Automatic Pressure Regulated Gas Flow Control Valve which will work automatically to maintain a gas pressure of 40 PSIG or more at the intel of factory RMS of TM Textile situated within its factory premises. This Automatic Pressure Regulated Gas Valve shall work in such a way that if the Gas pressure at the intel of factory RMS of TM Textile falls below 40 PSIG; this Gas Valve will automatically throttle/reduce gas supply/ flow to other factories and shall ensure & maintain a Gas Pressure of minimum 40 PSIG at the intel of factory RMS of TM Textile.
Such Automatic Pressure Regulated Gas Flow Control Valve shall be procured & installed by TM Textile and its operation, maintenance & supervision will be under control of TM Textile. However, Titas Gas Transmission & Distribution Company Limited shall give necessary assistance for interconnection of this Gas Valve with the Main 140 PSIG gas line as necessary ..
No other factories shall be given gas connection from the downstream of 12-inch 140 PSIG TMBD dedicated gas line through the Automatic Pressure Regulated Gas Valve except those factories as mentioned in the Titas Gas Letter No. ZBO/Bhaluka 757-6/889 Dated 30-3-2015.
Before giving gas connection to the above factories as mentioned in TITAS Letter dated 30-3-2015 noted above, all necessary expansion-modification works of TMBD RMS situated within TITAS Dhanua TBS shall be done by TITAS Company as it is mentioned in the same TITAS Gas Letter dated 30-3-2015.
TITAS Company shall ensure to maintain always a Gas Pressure of 140 PSIG or above at the entry point of l2-inch 140 PSlG TMBD dedicated gas line from the outlet of TMBD RMS situated at TITAS Gas Dhanua TBS."
14. The learned Counsels for the respondents conceded that the suggestion is workable. It was further contended that in the interest of justice, this Division should pass order that would safeguard the petitioner and would, at the same time, benefit the nine factories.
15. That being the case, we do not find it necessary to proceed with an academic discussion on the legality of the impugned orders. We feel that justice would be best served if the Rule is disposed of with the direction upon all concerned to ensure that the petitioner is ensured the  "approved gas supply and approved pressure" at all material times. No gas connection is to be provided to the other nine factories unless the "approved gas supply and the approved gas pressure" is ensured. The respondents are further directed to ensure strict compliance with the conditions set out in the aforesaid paragraph in connection with providing gas connection to the nine factories.
16. With the above observation, we are inclined to dispose of the Rule without any order as to costs.
Communicate the Judgment and Order at once.

Tariff
Add Rate

News Archive

Inside The New Nation

Cricket »

BD lose to NZ in third ODI


Sports Reporter :Despite Sabbir Rahman's century Bangladesh lost to New Zealand by 88 runs in the third and last One Day International (ODI) match at Dunedin in New Zealand on Wednesday. New Zealand clinched the ODI series 3-0.Sabbir hit a marvelous 102. His 110-ball innings was laced with 12 fours ...

Editorial »

True spirit of Ekushey must be reflected everywhere


THE nation solemnly remembers the supreme sacrifice of the valiant souls who laid down their lives to establish the right of our mother tongue Bangla as the state language of Pakistan on this day in 1952. As the pioneering movement that led to our ultimate independence, Ekushey invokes the emotional ...

International »

Palestinian President rejects tax money from Israel


Reuters, Ramallah, West Bank :The Palestinian Authority (PA) will no longer accept tax revenues collected on its behalf by Israel following its decision to trim the sum over the PA's financial support of militants' families, Palestinian President Mahmoud Abbas said.The cash-strapped Palestinian Authority, an interim self-government body set up following ...

City »

President of Bangladesh Diploma Student Nurses Union Sadia Akhter speaking at a press conference in DRU auditorium on Wednesday demanding Prime Minister Sheikh Hasina's intervention in resisting conspiracy to ruin nursing education.


.

Entertainment »

Strong and confident female characters attract Kriti Sanon


Actress Kriti Sanon is all set for a superb 2019 with Luka Chuppi, Arjun Patiala, Housefull 4 and Panipat. The characters the actress is essaying are strong-minded and confident as she is drawn towards such empowered characters. Kriti’s role in Bareilly Ki Barfi as Bitti was that of an independent ...

Editorial »

Prevent gas cylinder and pipeline explosions


GAS explosion has become very common in the country nowadays. Even if someone escapes death, the victim has to suffer burn injury or loss of valuable organs. The authorities concerned still did not take any effective step to control such incidents. In the latest incident, seven people including a couple ...

Entertainment »

Malaika Arora opens up about her divorce with Arbaaz Khan


Malaika Arora, who is recently making headlines for her relationship with Arjun Kapoor and the couples social PDA, recently opened up about her divorce with Arbaaz Khan on a radio show. Talking about her divorce she revealed that it was a mutual decision to part ways so that they could ...

City »

BNP Standing Committee Member Dr. Khondkar Mosharraf Hossain, among others, at a discussion organised by Bangladesh Jatiyatabadi Muktijoddha Dal at the Jatiya Press Club on Tuesday demanding release of BNP Chief Begum Khaleda Zia.


.

International »

Pakistan PM urges talks on Kashmir blast, warns India against attack


Reuters, Islamabad :Prime Minister Imran Khan said on Tuesday Pakistan was ready to cooperate with India in its investigation of a deadly bombing in the disputed Kashmir region last week, which India blamed on Pakistan, but warned of retaliation if attacked.Tension between the nuclear-armed neighbors has risen sharply over the ...

Sports »

Al Amin Zumar and Mukhtar Hossain of Daffodil International University receiving the championship trophy of the Inter-University Badminton Tournament and a cheque of Taka 15,000 from Dr Mohammed Farashuddin, Chairman, Board of Trustees of East West University, at the playground of East West University in the city on Monday.


.

Editorial »

Not memorization, students need analytical involvement


ABOUT one lakh students have applied to the Directorate of Primary Education (DPE) of the Primary and Mass Education Ministry for reexamination of their results, claiming that justice will be established if the authorities work properly. Some of students who failed in the examination alleged that they did not get ...

International »

`Crime may have been committed` by Trump: Ex-FBI official


AP, Washington :Former FBI Deputy Director Andrew McCabe said in an interview that aired Sunday that a "crime may have been committed" when President Donald Trump fired the head of the FBI and tried to publicly undermine an investigation into his campaign's ties to Russia. McCabe also said in the ...

Entertainment »

Moury Salim prefers challenging roles


Sheikh Arif Bulbon :Actress of present generation Moury Salim has been engaged with acting for many days. Though she has been busy with acting for long time but could not get the opportunity to work in challenging roles properly or the directors did not utilise her acting quality appropriately. On ...

Cricket »

Girona beat Real Madrid


BBC Online :Real Madrid missed the chance to go second in La Liga as Girona came from behind to record a surprise away win on Sunday.Casemiro powerfully headed in from Toni Kroos' deep cross from the right wing to give the hosts a first-half lead.Cristhian Stuani's penalty made it 1-1 ...

City »

Director General of Bangladesh Agricultural Research Institute Dr. Abul Kalam Azad speaking at the inaugural ceremony of a training programme on 'Marker Assisted Selection' at its seminar room in Gazipur on Monday.


.

 
Items that you save may be read at any time on your computer, iPad, iPhone or Android devices.
 
Are you new to our website? Do you have already an account at our website?
Create An Account Log in here
Email this news to a friend or like someone
Email:
Write a comment to this news